menu Gannol search
  • movieMoviearrow_drop_down
    • leaderboardPopular
    • slideshowNow Playing
    • reviewsTop Rated
    • event_upcomingUpcoming
    • categoryMovie Genres
  • tvTVarrow_drop_down
    • todayAiring Today
    • live_tvOn The Air
    • leaderboardPopular
    • reviewsTop Rated
    • categoryTV Genres
  • loginSign In
  • person_addSign Up

On the Critical Path

01 Jan 1971
  • Canada
22 mins
0
0 votes
  • Documentary
articleOverview personCast
Nuclear power plants are not exactly sold on the same scale as wheat, but that they can be manufactured as an exportable commodity is well illustrated in this film. For those familiar with nuclear power generation, and even for the lay audience, this is a lucid exposition of how a nuclear power plant is put together. The film shows the machining and assembly of principal components, and the "on power" operation of the Canadian plant at Pickering, Ontario. Produced by the NFB for Atomic Energy of Canada Limited.

Browse and Watch or Download all your favorite movie and series for free.

Movie

  • Popular
  • Now Playing
  • Top Rated
  • Upcoming

TV

  • Airing Today
  • On The Air
  • Popular
  • Top Rated

Helps Pages

  • Contact
  • Copyright
  • DMCA
  • Privacy Policy